Follow the progress of construction (and sometimes destruction) of my N-scale model train layout.

April 27, 2011

Golden Spike


I put down the last piece of track on the two main loops last night. Now I can run two trains continuously. I still have to finish off a few sidings but those are easy to do.

In the photo to the left you can see the back side of the layout. The track and passing siding on the right will be hidden behind a hill. The middle portion of the track on the right will visible from the front of the layout. It will enter a tunnel in the hill where it gets close to the track on the left at the top and bottom of the photo.

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home