A big area of work was the two bridges that span the river. In my previous post I talked about scratch building one. Since then I constructed abutments, painted the bridge, and installed it. For my scratch build bridge I installed it so that the deck was level with the ground and secured the cork road bed to it using caulk. I am planning ballasting this bridge.
I had to raise the abutments for the Atlas prefab bridge, the one in the front of the picture, to the level of the cork roadbed since it had the track pre-installed. It also has more detail for the bridge ties so I will not try to ballast this one.
The next step is to install the crossovers and the Tortoise switch machines that will control them. I am taking the trouble to install switch machines here because the two turnouts are connected by legs so it doesn't do any good to switch one without switching the other. Using the machines lets me insure that they are always consistently aligned.