Follow the progress of construction (and sometimes destruction) of my N-scale model train layout.

July 12, 2007

Buildings


It has been a while since my last post, but the blocks have all been wired and buildings have sprung up as well.

Most of the buildings, with the exception of the small freight depot, were scratch build from cereal boxes. A few of the more detailed ones, like the signal tower have been glued to the layout, the other are held in place with pins. This way I can take them off and add more detail to them later.

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home