Another Layout Plan
Not much going on with the layout. I have been working on a few minor things since my last post.
- Refurbish one of the cars that I had mangled trying to make a cleaning car. This involved creating styrene panels to go over the holes in the side and upgrading to Micro Trains couplers.
- Minor layout work. Scenicing a few more areas and rearranging the buildings once more.
The idea was to focus more on just having the trains run then doing switching. It is extended to 8 ft. for longer trains (maybe passenger trains in the future). This means that I can double the length of my trains from 3 cars to 6. The area at the top is a passing siding (and possibly a station). The area at the bottom contains industrial sidings.
I was planning on having 3-4 industries along the bottom sidings. It would be nice to be able to squeeze in one more siding not attached to the large passing siding so I could feel like I wasn't doing all the switching in one place.
The big dilemma is where to put the staging. I included a unconnected interchange track at the top as a possiblilty for off layout staging but then that means the layout will be even larger. I thought about having under the layout staging, but that is tricky with getting the trains down to a lower level with enough clearance to pick up any accidental derailments. I guess that leaves up top by the passing siding. Oh well that is a problem for another day.
0 Comments:
Post a Comment
Subscribe to Post Comments [Atom]
<< Home